SL. NO | NAME OF PROJECT | CLIENTS | AWARDED DATE | COMPLETION DATE |
---|---|---|---|---|
1 | Thermocouples, Cable Laying, Removal of Existing Thermocouple, transmitter signal cables, setc at DR2 Reformer are during shutdown 2019 | Qatar Steel | 7/Jan/19 | 30/Mar/19 |
2 | Inspection, Repair, Testing & Commissioning of Fire Fighting System in EF5 Plant Area | Qatar Steel | 1/Mar/18 | 31/Jan/19 |
3 | Extension of Canopy & Additional Building | Doha Petrol Centre | 15/Feb/16 | 27/Jan/19 |
4 | Replacement of EOT Crane No. 11 & 12 Power Feeding Bus Bars in RM1 | Qatar Steel | 13/Dec/18 | 27/Dec/18 |
5 | Mechanical Equipments & Piping Services Works for Doha West Sewage Treatment Works Ext. 5 | Suez Degremont | 10/Feb/16 | 5/Oct/18 |
6 | Construction of Majilis at Al-Huwaila | Sheikh Khalid | 06/Nov/12 | 1/Mar/18 |
7 | PEB Steel Erection & Cladding Works @ Milaha Logistics City | RAMCO | 30/Nov/15 | 15/Dec/17 |
8 | EPC for NG Filter | QAFAC | 01/Feb/17 | 30/Nov/17 |
9 | Construction of Dining Hall on First Floor of Intermediate Mess & Modification of Intermediate & Senior Mess Hall at Qatar Steel, Mesaieed | Qatar Steel | 15/Jun/16 | 30/Apr/17 |
10 | EPIC for Cathodic Protection System of JTF Water Tanks with Dukhan Fields | Qatar Petroleum | 10/Jan/16 | 09/Jul/17 |
11 | Cathodic protection System for Waste Water Injection Well Casings (RLIC 18 & 19) | Rasgas | 15/Dec/15 | 14/Jun/17 |
12 | Refurbishing & Repainting of above Ground Storage Tanks used for Petroleum Products for period of 5 years | WOQOD | 17/Aug/16 | 30/Nov/16 |
13 | Fabrication , Supply & Installtion of Safety & Process Improvement Items in DR-1 Module | Qatar Steel | 10/Feb/16 | 07/Nov/16 |
14 | Supply, Installation & Erect Precision A/C and False Ceiling at WOQOD Warehouse at Industrial Area | WOQOD | 01/Aug/16 | 31/Oct/16 |
15 | Construction of WOQOD Fuel Station Extension (Sevice yard & Substation) at Muaither Area | WOQOD | 01/Aug/16 | 30/Sep/16 |
16 | Demoslihing & reconstruction of Boundary Wall at Street # 52 | TISSCO | 15/Jun/16 | 15/Sep/16 |
17 | Leak Repair Works for Fire Fighting Hydrant Lines St 52 Complex | TISSCO | 01/Jul/16 | 15/Sep/16 |
18 | Fixing Pipelines & Drinking Water Coolers in EF5 | Qatar Steel | 01/Jun/16 | 31/Jul/16 |
19 | Concrete Flooring & Reinstatement of Paving Tiles for 7 WOQOD Petrol Stations | WOQOD | 28/Jul/15 | 29/Jul/16 |
20 | Construction of Store at Berket Al Awamer | Excel Trading | 07/Feb/16 | 31/May/16 |
21 | Patch Painting on Call- Off Basis | Qatar Petroleum | 23/May/13 | 22/May/16 |
22 | Dismantling, Installation & Start-up of 3 Nos. AHU pacakages in Q3 Substation | Qatar Fertiliser Company | 03/Feb/16 | 06/Apr/16 |
23 | Belleli Construction of UG GRP Septic Tank & Misc. Civil Works | Exterran Belleli Energy Srl | 27/Jan/16 | 05/Mar/16 |
24 | Electrical repair Works at Al Hewar Petrol Station | Teyseer Services Centre | 11/Jan/16 | 28/Feb/16 |
25 | Construction of Warehouse including Design & Supply | Excel Trading | 01/Jul/15 | 29/Feb/16 |
26 | Electrical repair Works at Al Hewar Petrol Station | Teyseer Services Centre | 11/Jan/16 | 28/Feb/16 |
27 | Replacement of Rail & Accessories | Qatar Steel | 10/Oct/15 | 08/Jan/16 |
28 | Fabrication & Erection of Cold Natural Gas pipeline | Qatar Steel | 22/Jul/15 | 10/Jan/16 |
29 | Cathodic Protection Works for GAS Operations (Mesaieed) | Qatar Petroleum | 24/May/15 | 23/Nov/15 |
30 | Miscellaneous Civil Construction, Repair, Replacement & Modification Works inside Qatar Steel | Qatar Steel | 15/Sep/15 | 15/Dec/15 |
31 | Supply, Fabrication of Induction Furnace | Qatalum | 05/Aug/15 | 17/Sep/15 |
32 | Warehouse for GDI including Variation | Gulf Drilling International | 20/Apr/15 | 31/Oct/15 |
33 | EPIC for Wellhead SCADA & Cathodic Protection in Dukhan | Qatar Kentz/QP | 27/Apr/15 | 3/Aug/15 |